Upon completion of building construction, testing for proof of acceptable coverage is required to ensure that the two-way coverage on each floor of the building is not less than 95% or 99% for critical areas. Coverage shall be based on operation with fire door(s) closed. The test procedure shall follow the requirements of CFC 510.5.4.